Negotiable
The date of payment from buyers deliver within days
Zhejiang
Long-term effective
2017-11-08 22:49
157
Company Profile
Chongqing Gold Mechanical & Electrical Equipment Co., Ltd.By certification [File Integrity]
Contact:Miss Lina(Mr.)
Email:
Telephone:
Area:Zhejiang
Address:Zhejiang
Website: http://chhongyin2015.0356meishi.com/
1. Connect the measured voltage to the terminal of 1 and 2
2. External current transformer installation as graph 1: let the wire across the hole on the current transformer, and then connect the two wires of the secondary transformer to the terminal of 3 and 4 on the meter
3. Internal current transformer installation as graph 2: Let the wire across the hole on the current transformer (the direction do not impact the measure result).
4. The default display power is active power (V), Click the switch (SAM CK) can change to the reactive power (VA) and power factor(cosφ)